We had first inspection last Thursday. Merv the Supervisor was very good ge fixed all small problems on the spot. Because there were no problems and we had the bank cheque ready we were able to pick the keys up that day! WOOHOOO!
It's currently 12:13am on Tuesday morning (excuse the typos) and Sher and I have spent 13 hours straight moving all our stuff from my Mum's house and our current house in Kinglsey.
WHAT A MISSION! I'm never moving again. I think I will stay in this house for ever. Luckily we rented a truck and it had a hyrdaulic lifter on the back. So much easier!
I have the rest of the week off work to do odd things around the house.
- Builid a Shed
- Seal the walls
- Buy a Letterbox
- Pave crossover and path to front door
Wish me luck! =(
I will have some pics soon. Too tired to organise anything now.
Monday, February 11, 2008
Monday, January 21, 2008
Finally Inspection Is Booked For The 4th Of Feb!!!
Got a call from Content today, the first inspection is on the 4th of February Whoo Hoo!!!
Only two weeks to go! Also, have put some pics on from Sundays visit, everything is basically finished, they just have to patch up some holes etc and clean up. Looks awesome!

Our back yard with the fences up

Alfresco now paved, looks huge now!

Driveway paved and rollerdoor on

Two conjuits and a power point in our home theatre
all different heights (whats with that?)

Back doors out to padio
Only two weeks to go! Also, have put some pics on from Sundays visit, everything is basically finished, they just have to patch up some holes etc and clean up. Looks awesome!
Our back yard with the fences up
Alfresco now paved, looks huge now!
Driveway paved and rollerdoor on
Two conjuits and a power point in our home theatre
all different heights (whats with that?)
Back doors out to padio
Fan forced oven installed
The boys putting the spare paving
bricks in the garage
Hot plates installed
Kitchen
Dad, Uncle Rob, Mum and Kel
House from the front
Ensuite double shower
Ensuite Toilet
Ensuite again
Front door and veranda paving
Saturday, January 19, 2008
Driveway & Alfresco Paving
Inside House

Our Ensuite

Master Bedroom wall. This is where the bed will rest up against. We got the builder install some lighting above the bed. I made the builder move the switches because they weren't centered.

Our new Chef Fan forced Oven

And Chef Gas Hotplate. We have decided not to go for stainless steel because it's a nightmare to clean.
Sunday, January 13, 2008
Garage Floor and Fences
Tuesday, January 8, 2008
Stormwater Pipes
Well we picked a great day for digging trenches. I think it reached 35 degrees on Sunday. We had to lay all the stormwater pipes for the soakwells before Content starting paving and pouring the garage floor. My mate Brad agreed to help me move the pipes from Bunnings and help me dig but I don't think he knew what he got him self in for. Thanks to Sher's Dad John for all his help. Probably would have taken us 2 days if we didn't have John showing us what to do.
Subscribe to:
Posts (Atom)