Wednesday, July 18, 2007

Window frames have arrived

Looks like our windows/door frames have arrived. We also have heaps of sand on our pad for some reason.


4 comments:

Perth_Euro said...

there would be sand on your pad as the plumber has been along and connected the plumbing that was prelaid before slab went down to each other and ran it out to the front of the block.He probably used a very small excavator to dig the trench.
Having the house close to an existing fence gives them very little room to do this connection once walls are up.(atleast on that fence side)
The final conection wont be made till much later.

Ben said...

Thanks for explaining that for me.

When your bricks arrived how long until the brickies showed up?

Perth_Euro said...

it was a full month, but it was also over christmas

Anonymous said...

Hi, Im going to be your neighbour 2 doors down. Your going to love me and always feel safe and loved. Ps I have a feeling we will be related in 3.5 months hahahahah "suffeeeeer" (love kel)