Thursday, December 13, 2007

Bricks and Stuff!

Kelly went up to the house today and the bricks have arrived for our driveway, so hopefully they will start that soon so I won't have black feet and thongs after every visit!
Our gutters and doors etc have also had another coat of paint, looks great.
Taking a friend up on Saturday to have a look, so I am hoping the driveway will mabye be started by then.

Tuesday, December 11, 2007

Painting and Progress Update

The front door has been given one coat of paint, along with the gutters, downpipes and internal doors, the second coat will hopefully be done next time we go up. Next should be the plumber and the electrician, then the garage floor will be poured and the garage door (cream) will go on.
We think we should be in in around 10 weeks, but we will say March as we are getting an external building inspector, who will come in and do up a report on everything that needs fixing, and that will probably take a month or so before all the problems are fixed.
We have also put in our fencing form, so they should go in in about 6-8 weeks.








Saturday, December 8, 2007

Tiling and Grout Completed

Went up to the house again with Kel, and the tilers were there working, they have grouted both bathrooms, and done the skirting tiles in the laundry, the laundry splashback and the kitchen splash back, it looks awesome.


Ensuite (Grout now done)


Ensuite Shower


Back toilet skirting done


Laundry skirting done


Laundry splashback done


Back bathroom splashback done


Back bathroom shower tiles


Back bathroom shower

Kitchen splashback


Kitchen bench


Kitchen splash back again

Friday, December 7, 2007

More Tiles and Grout!!!

Took Mum (Holt) up to the house today after work for a quick look, and they have managed to grout the whole floor in the back bathroom, put all the wall tiles on, and tile the bath hob and bath surroundings. They have also tiled the entire ensuite, and grouted some of the floor in there too. Looks great, and will even better once its all grouted and cleaned, as its very dusty : )


Ensuite


Ensuite Shower


Ensuite Toilet floor (grouted)


Back Bathroom

Back Bathroom Shower


Bath
Back Toilet (Grouted)

Wednesday, December 5, 2007

Tiles, Shelves and Rails and Bathroom Finishings!

The floor tiles have been laid in both the bathroom and the ensuite (no grout yet,) the shelves and rails have been installed in all the robes, pantry and cupboard, and the towel railing and toilet roll holders have been installed. Good progress! Hopefully the wall tiles were done today.


Kitchen Pantry
Linen Cupboard

Master bedroom walk in robe
M B WIR
Ensuite
Ensuite
Shower in Ensuite
Bed 2 Single Robe

Guest Bathroom
Guest Bathroom Shower

Guest Bathroom Vanity


Bed 3 Walk In Robe

Bed 4 Double Robe

Monday, December 3, 2007

Doors, A Bath and Shower Hobs!

Went up to the house for a visit on Sunday, lots has been happening, all our doors have been hung, the bath is in and bricked, the shower hobs have been bricked and rendered, the sealer has been done in both bathrooms, as well as the concrete being been poured in the bathrooms ready for the tiles, which have been delivered, along with the bathroom accessories. We also went and bought more of our back bathroom tiles so we can do the laundry in the same.
Getting close now, CAN'T WAIT!!!


Back bathroom shower hob
Back Sliding Doors

Family Room (New sliding door)


Kitchen
Kitchen

Back two bedroom doors

Back bedroom wardrobe

Laundry Tub

Hall way facing back bedrooms


Sliding door from hall to family room


Sliding door

Back bathroom sink

Sher in the back bathroom shower


Bath

Friday, November 23, 2007